Industrial refrigeration on measures

A specialized area of engineering

Each system is different from the others, operates under its own conditions and responds to the specific needs of a production plant. The selection and correct application of the components of a refrigeration plant require a technical study presented by a qualified specialist with extensive experience.

By: José Ignacio Melo*


The preparation of personnel for the handling, maintenance and operation of equipment is another characteristic of industrial refrigeration.

- Publicidad -

A system must be identified with the specific functions for which it is intended, whether pre-cooling, rapid cooling, freezing, tempering, maturation, drying, dehydration or other characteristics.

For a new project or the expansion of a refrigeration facility, investments are required to adapt to production needs, improve the overall efficiency of processes, reduce energy costs or innovate technology.

The proper application and selection of the elements of a refrigeration system for a particular industrial plant is the result of the experience and good judgment of the engineers in charge of the project. A refrigeration plant must produce the requested cooling capacity under the correct conditions of temperature, humidity, air velocity and air quality adjusted to the requirements of the production requirements.

Technical and economic convenience
Product losses that occur during cooling and freezing processes, losses due to physical damage, deterioration or breakage of product or losses due to dehydration are widely known. They occur in any process but can be minimized. Poor design raises losses to 3% or 4% of production, while proper design can reduce them to less than 1%.

Economic considerations affect the type of system and equipment that can be presented for consideration by an investor or the financial manager in the company. Perhaps they are the most important, especially the cost-benefit analysis of the investment. An investor can look for the lowest upfront cost, the best form of payment, or the lowest overall cost including operation and maintenance for a convenient period.

In energy aspects, the plants must be designed or renovated with specific objectives, aimed at reducing energy consumption and increasing the total efficiency of the installation. Within these energy goals, there are a large number of feasible projects such as:

  • Replace small and medium individual systems with an ammonia system.
  • Replace old insulation of pipes and refrigerated chambers with new materials of high insulating factor and non-contaminants .
  • Transform low temperature single compression systems by double stage or cascade systems.
  • Change old compressors, to obsolete piston or screw, to control energy consumption according to operating conditions in real time.
  • Add economizer to existing screws, if you are at the top of your capacity most of the time. Install  oil cooling by thermosyphon.
  • Install oil or refrigerant recycling systems according to the cado.
  • Transform the defrosting of evaporators to use hot gas.
  • Install intelligent control for automatic system operation.
  • Many other options based on the needs of your plant.

When a system meets demands
A competitive company seeks to integrate the future of the organization into a planned, structured and harmonious project. A short-term company thinks in terms of solutions in sight, it is installing each equipment that production requires or that is offered at opportunity cost.

- Publicidad -

An industrial refrigeration project must coordinate and integrate in a single system both the equipment, refrigeration and its networks with the control system and plant production. Therefore the design engineer must understand the product, origin, magnitude and characteristics and the interaction of the different load factors, their assimilation and elimination by the cold system. Each quarter or process of the production chain has individual characteristics.

The industrial refrigeration engineer in charge of a project of any size will seek to successfully anticipate reality. To achieve this, you must consider the aspects that are presented to you. Define the problem as a first step. Be able to anticipate the performance of the system in the face of weather conditions or outdoor environment and the thermal load conditions of plant processes. The cooling system must meet the maximum demands presented at any time and operate correctly under all conditions of partial thermal load.

The information required should include:

a.    Financial capacity of the company and objective of the investment

b.    Installation   Information

  • Objective or purpose of the system 
  • Location     
  • Construction plans and building characteristics

c.    External     environmental conditions

  • Dry and wet bulb temperatures   
  • Relative     humidity
  • Wind speed and direction     
  • Exposure to sun loads
  • External protection of facilities
- Publicidad -

d.    Load analysis of products and processes

  • Production flows
  • Conditions of entry and exit
  • Cooling or freezing rate
  • Packaging, storage and handling.

e.    Other loads for the cooling system.     

  • Regimes of operation of machinery and equipment.
  • Lighting
  • Operators
  • Other

f.    Plant availability for the refrigeration system.

  • Electrical energy. Characteristics of forces and lighting
  • Drinking water. Conditions of hardness and concentration of solids.
  • Utility networks of condensing water, compressed air, gas, etc.
  • Spaces built or intended for equipment and networks.

g.    Other benefits and purposes sought with the installation.

Environment and safety
The installation must be fully integrated with its environment and environment seeking a very normal and humanized operation, complying with regulations, standards and codes, especially regarding the disposal of heat, liquids and vapors into the environment and the sound effect of the equipment that makes up the system.

Consideration of control and safety aspects for people is of the utmost importance. The preparation of personnel in the handling, maintenance and operation of equipment characterizes industrial refrigeration. The potential risk grows, not only because of the installation itself, but also because of the lack of knowledge and poor preparation of the staff.

Phases of a project
The stages of carrying out a project include:

a.    The diagnosis or formulation of requirements
b.    Product and process analysis
c.    Process flowchart
d.    Calculation of capacities
e.    System design, equipment and material specifications
f.    Supply and installation contracts
g.    Assemblies of networks, equipment and insulation
h.    Commissioning, testing, adjustments
i.    Training of personnel in charge of operation.

These steps ensure a refrigeration installation adjusted to the needs of each of the projects proposed.

*José Ignacio Melo is a consultant in air conditioning and industrial refrigeration. You can be contacted at the mail [email protected]

No comments

• If you're already registered, please log in first. Your email will not be published.

Comments are closed

The comments for this content are closed.

Case Study: Strengthening Technical Capacities in Ventilation with Vortice Group

Case Study: Strengthening Technical Capacities in Ventilation with Vortice Group

Costa Rica. In a clear sign of commitment to technical training and professional development in the sector, Vortice Group celebrated the graduation of the course "Discovering Ventilation", an...

Lennox Acquires NSI Industries' HVAC Division for $550 Million

Lennox Acquires NSI Industries' HVAC Division for $550 Million

United States. Lennox International Inc. NSI Industries today announced the signing of a definitive agreement to acquire NSI Industries' HVAC division from Sentinel Capital Partners for...

Copeland presents its first Global Impact Report with ambitious sustainability goals

Copeland presents its first Global Impact Report with ambitious sustainability goals

United States. Copeland announced the release of its first Global Impact Report, revealing its progress and commitments in environmental sustainability, social progress and operational excellence.

Armstrong Unveils New Enhancements to its Envelope Platform

Armstrong Unveils New Enhancements to its Envelope Platform

Canada. Armstrong Fluid Technology announced the release of two new enhancements to its Envelope platform, a digital solution designed to optimize fluid flow in HVAC systems through performance...

Webinar: HVAC Data Collection for Optimal Performance

Webinar: HVAC Data Collection for Optimal Performance

Topic: HVAC Data Collection for Optimal Performance By: Eng. Néstor Zanabria, Sales Engineer Mexico - Armstrong Fluid TechnologiesDate: Tuesday, August 26, 2025 Time: 10.00H (Colombia) 09:00H...

Fans and Energy Efficiency: Free Webinar

Fans and Energy Efficiency: Free Webinar

International. On August 26, 2025, ASHRAE (Mexico Chapter) will present the technical webinar "Fans and Energy Efficiency", an online space to discover how technologies such as VFDs, efficient...

Full Gauge Controls Extends 10-Year Warranty to All Customers Worldwide

Full Gauge Controls Extends 10-Year Warranty to All Customers Worldwide

Brazil. Full Gauge Controls announced that its 10-year warranty, in place in Brazil for more than two decades, now extends to all international markets.

KNX LATAM presents the

KNX LATAM presents the "Building Automation Days" in Mexico City and Buenos Aires in October: innovation, technology and networking for the future of buildings

Latin America. The building automation community is preparing to host one of the most relevant meetings in intelligent automation and sustainable construction. KNX LATAM announced that in October it...

Just 2 days away: Barranquilla gets ready for the 24th ExpoAcaire 2025

Just 2 days away: Barranquilla gets ready for the 24th ExpoAcaire 2025

Colombia. From August 13 to 15, the Puerta de Oro Event Center will host the 24th ExpoAcaire and the VI International Congress of Commercial and Industrial Refrigeration, the most important meeting...

Greenheck Expands Rooftop Unit Line with New RT-40 Model

Greenheck Expands Rooftop Unit Line with New RT-40 Model

United States. Greenheck announced the addition of the Model RT-40 to its rooftop unit (RTU) portfolio, expanding HVAC solutions with capacities from 6.5 to 10 tons of packaged DX cooling, 1,200 to...

Free Subscription
Remember Me
SUBSCRIBE TO OUR NEWSLETTER
DO YOU NEED A SERVICE OR PRODUCT QUOTE?
LASTEST INTERVIEWS
SITE SPONSORS










LASTEST NEWSLETTER
Ultimo Info-Boletin