Select your language

Addressing HVAC Issues

HVAC sucioThe cleaning of the split and minisplit systems is vital for the equipment to operate correctly throughout the lifetime for which it was designed. by Jorge Gaitán*
 

The accumulation of contaminants and poor maintenance are the two main causes of inefficiency and failures of HVAC systems. Allowing dust to accumulate in coils and filters and delay in performing permanent maintenance can lead to higher prices on energy bills and service costs, accompanied by deterioration of buildings' internal air quality. To protect performance, split system components must be maintained twice a year. Below is a checklist for maintenance. Cleaning
Remove dust and dirt from the evaporator and condenser coils. A dirty coil reduces the equipment's ability to cool your building and causes the system to operate longer and this causes an increase in energy costs. External coils: Turn off the power supply of the unit. Remove all debris in the area and wash the coil with a hose. If the coil has a screen, wiring or blind and debris cannot be removed with the use of water, the top of the unit should be removed or the blind panels should be opened or removed. Ventilation components: They must be cleaned regularly and adjusted in such a way as to preserve proper airflow to achieve comfort and energy efficiency.  Problems with airflow can reduce the efficiency of the system by up to about 15%. Air filters: They should be checked once a month during the operating season and should be cleaned or replaced when necessary. Dirt filters can damage equipment and cause increased operation, which requires higher energy expenditure, and this can reduce the life of the equipment. Check the condensate drain lines and drain trays and perform the respective cleaning, if necessary. A clogged drain can cause high humidity and can lead to leakage and water damage. The heat exchangers, the furnace burner assembly and the ignition system should be checked, and the necessary cleaning should be carried out.
 


Verification
- Check thermostat settings to make sure the cooling system turns on or off at programmed temperatures. Check the power cycle of the equipment to ensure that the system power on is properly turned on or off. - Adjust the refrigerant charge if necessary. An inappropriate load causes the system to operate in a forced manner and use more energy; it also reduces the useful life of the equipment. Adjust electrical connections and measure the current consumption of all motors. - Check damage or wear of the entire control box, including contactors, relays, circuit boards, capacitors and other accessories. - Ducts should be checked to rule out leaks. - Check for possible damage, friction noise or vibration of the fan motor and blades. Visually check connection lines and coolant coils or leaks. - Make sure that the extraction system is properly connected to the furnace and make the necessary repairs to the damaged parts. - Check the heat exchanger to rule out any signs of corrosion. Replace it if necessary. Treatment
Adjust the ventilation speed for cooling. Measure pressure drops on the coil to determine the correct PCM (cubic feet per minute) of the ventilation, as set out in the unit's maintenance manual. In the ventilation of the transmission mechanism, check for any possible wear of belts and replace them annually or when necessary, and adjust the tension. If the unit is an older model that has no pre-lubrication or sealing, you must ensure that all moving parts are fully lubricated. Otherwise, friction can increase energy expenditure. While the system is in operation, its ignition should be monitored and the possible presence of abnormal noises or odors should be heard. Measure the external temperature of dry bulb and the internal temperature of dry and wet bulb throughout the coil. *Lennox Industries

Building Automation Days 2025 in Bogota marks a milestone for the KNX standard in Latin America

Building Automation Days 2025 in Bogota marks a milestone for the KNX standard in Latin America

Colombia. With more than a hundred attendees and the participation of six high-profile exhibitors, Building Automation Days by KNX LATAM, Colombia edition, established itself as the most relevant...

Design Envelope Technology Hits 750 gpm Fire Pump Segment

Design Envelope Technology Hits 750 gpm Fire Pump Segment

Canada. In response to the growing demands of the fire protection industry, Armstrong Fluid Technology announced the expansion of its Vertical-In-Line pump line with the addition of the new 5x4x10PF...

Greenheck Launches New RV-220 Model and Expands Its Line of Dedicated Outdoor Air Systems

Greenheck Launches New RV-220 Model and Expands Its Line of Dedicated Outdoor Air Systems

United States. Greenheck announced the addition of the RV-220 to its line of dedicated outdoor air systems (DOAS), a solution that responds to the growing demand for equipment with greater outdoor...

Embraco enters the HVAC market with new scroll compressors and aims to become a full-service supplier

Embraco enters the HVAC market with new scroll compressors and aims to become a full-service supplier

Brazil. Embraco announced its official entry into the heating, ventilation and air conditioning (HVAC) market following the acquisition of the specialized company Xecom, and the launch of a new line...

SIGMAN GROUP and Carrier-VRF reinforce technical training in the HVAC sector in Ecuador

SIGMAN GROUP and Carrier-VRF reinforce technical training in the HVAC sector in Ecuador

Ecuador. An intensive week of technical and commercial training brought together key players in the HVAC sector in Quito and Guayaquil, thanks to the joint initiative of GRUPO SIGMAN and...

AHR Expo Mexico 2025 returns to Monterrey with its most ambitious edition yet

AHR Expo Mexico 2025 returns to Monterrey with its most ambitious edition yet

Mexico. The event returns this year to Monterrey with an unprecedented edition. The exhibition, dedicated to air conditioning, ventilation, heating, refrigeration and filtration solutions, promises...

Fujitsu Launches New AIRSTAGE Multi-Position Air Handler with R-32 Refrigerant

Fujitsu Launches New AIRSTAGE Multi-Position Air Handler with R-32 Refrigerant

United States. Fujitsu General America announced the launch of its new AIRSTAGE Multi-Position Air Handling Unit (MPAHU), designed to provide greater application flexibility by easily...

HVAC project at the Javeriana University, finalist in the CALA Awards 2025 in the HVAC category

HVAC project at the Javeriana University, finalist in the CALA Awards 2025 in the HVAC category

The HVAC system installed in the building of the Faculty of Sciences of the Pontificia Universidad Javeriana, in Bogotá, was selected as a finalist in the HVAC category of the CALA Awards 2025. The...

Concord Project in La Lima Free Trade Zone, finalist in the HVAC category of the CALA Awards 2025

Concord Project in La Lima Free Trade Zone, finalist in the HVAC category of the CALA Awards 2025

The HVAC system project carried out by MultiFRIO for the company Concord in the La Lima Free Trade Zone, in Cartago, received the final prize in the HVAC category of the CALA Awards 2025, a...

HVAC project at the Universidad Santiago de Cali, finalist in the CALA AWARDS HVAC category

HVAC project at the Universidad Santiago de Cali, finalist in the CALA AWARDS HVAC category

The air conditioning project of the Auditorium Building and the Technology Center of the new campus of the Santiago de Cali University was chosen as a finalist in the HVAC category of the CALA...

Free Subscription
Remember Me
SUBSCRIBE TO OUR NEWSLETTER
DO YOU NEED A SERVICE OR PRODUCT QUOTE?
LASTEST INTERVIEWS
SITE SPONSORS










LASTEST NEWSLETTER
Ultimo Info-Boletin